Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
Prevents the scheduler from starting new jobs and tasks on the specified node until the ICluster::ResumeNode method is called. New jobs and tasks will not start while the node is paused, but existing jobs and tasks will continue to run.
Syntax
HRESULT PauseNode(
[in] BSTR NodeName
);
Parameters
- NodeName [in]
The name of the node.
Return value
If the method succeeds, the return value is S_OK. Otherwise, the return value is an error code. To get a description of the error, call the ICluster::get_ErrorMessage method.
Requirements
Product |
Compute Cluster Pack Client Utilities |
Type library |
Ccpapi.tlb |