Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
Retrieves the ending date of the last ended backflush costing calculation period for a given production flow.
Syntax
client server public static TransDate lastEndedToDate(RefRecId _leanProductionFlowReferenceRecId, TransDate _currentDate)
Run On
Called
Parameters
- _leanProductionFlowReferenceRecId
Type: RefRecId Extended Data Type
The record ID value of the production flow reference for which to return the last end date.
- _currentDate
Type: TransDate Extended Data Type
The date of reference.
Return Value
Type: TransDate Extended Data Type
The ending date of the last ended backflush costing calculation period; otherwise an empty date.