For a Task , Duration is the total span of active working time.
For a task's Baseline , it is the scheduled duration of the task when the baseline was saved.
For Sprints, the duration value of the sprint.
<Duration>
TimeSpanValue
</Duration>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |