Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
The difference between the baseline cost and total cost for a resource or assignment.
<CostVariance>
FloatValue
</CostVariance>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |
See Also
Concepts
Resource Elements and XML Structure
XML Schema for the Resources Element