Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
The budgeted work amount for work or material resources on an assignment.
<BudgetWork>
DurationValue
</BudgetWork>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |
Text Value
A text value of type duration is required.